Live Opportunities
191
Data Freshness
Daily Sync
Top Segment
Services
Budget Range
2.0 Cr - 3403.2 Cr
Live Opportunities
Construction of 4 lane Bypass Road to the existing NH 31 and NH 922 through Bairiya Ara section from Km. 0.000 to Km. 27.062 in the State of Uttar Pradesh and Bihar on EPC Mode
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from Km 0.000 to Km 77.102 (Chitrakoot Majhgawan Satna section) of NH 135BG (Design length 77.102 km) under NH(O) in the State of Uttar Pradesh and Madhya Pradesh on HAM
Consultancy Services for Independent Engineer for 4 Laning of Muzaffarpur Sitamarhi Sonbarsa section of NH 22 (Design Ch. Km. 0.000 to Design Ch. Km. 82.551 Total Length 82.551 Km) in the state of Bihar on Hybrid Annuity Mode (HAM) (2nd Call)
Independent Engineer Services for Construction of New four lane Sambalpur Bypass from Km 0.000 to Km 35.384 under NH(O) on Hybrid Annuity Mode in the state of Odisha (3rd Call)
CS for Independent Engineer for Widening and Upgradation of existing highway from Khagaria Design Ch.270.000 to Purnea Ch.413.529 section of NH31-NH231 to 4 lane with paved shoulder under NHO on BOT (Toll) in the State of Bihar (2nd Call)
Consultancy services for preparation of the Detailed Project Report for 4 laning of the section from Ghazipur in the state of Uttar Pradesh to Chausa in the State of Bihar.
Development of a Link Connector Corridor connecting the NH-31 and Varanasi Ring Road along the River Varuna for Decongestion of Varanasi City PKG2 from Km11.744-km19.420 (TL 14.720Km including Loop Ramp) in the State of Uttar Pradesh on HAM
Consultancy Services for preparation of DPR for widening and upgradation to 4 Lane Divided Carriageway of Korha (junction of NH31 and NH231) to Bihar/West Bengal Border section of NH31 in Bihar (Length 55.40 km.)
CS FOR PREP OF DPR FOR DEVELOP. OF 4 L ROAD BETWEEN KOZHIKODE KM 5.000 to MUTHANGA KM 117.600 of NH766 ALONG WITH ALTERNATE 4L BYPASS OPTION OF THAMARASERRY GHAT PORTION IN KERALA
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR DEVELOPMENT OF 4 LANE ROAD FROM KM 62.100 (ANJILIMOODU NEAR CHENGANUR TOWN) TO KUMILY KM 215.450 OF NH 183 IN THE STATE OF KERALA
Development of a Link/Connector Corridor connecting the NH 31 and Varanasi Ring Road along the River Varuna for Decongestion of Varanasi City PKG 1 from Km 0.000 to Km 11.744 (TL 28.498 Km including MCW/Flyover/Loop/Ramp/Link Road) in UP on HAM.
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF SECOND PARALLEL TUBE ADJACENT TO EXISTING NAGABASTI SINGLE TUBE TUNNEL (CH. 138) FOR ITS CONVERSION INTO TWIN TUBE 4 LANE CONFIGURATION IN THE STATE OF ASSAM
Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City PKG2 from Km7.926-Km18.560 (TL 26.039Km MCW FOB Loop Ramp) in UP on HAM
Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City Pkg 1 from Km 0.000-Km7.926 (TL 20.00Km MCW Loop Ramp Link Road) in UP on HAM
Construction of Perimeter Roads on Both sides of Emergency Landing Facilities (ELF) including ATC Plinth (50m x 50m) on Chilakaluripeta Nellore Section of NH16 from Km. 1210.000 to Km. 1214.600 in Andhra Pradesh on EPC Mode
Widening and Upgradation of existing highway from Khagaria (Design Ch. 270.000) to Purnea (Design Ch. 413.529) section of NH 31 and NH 231 to 4 lane with paved shoulders under NH (O) on BOT (Toll) in the State of Bihar (2 nd call)
IE Services for (PKG-2) Cons.of 6L access controlled greenfield highway from Ahilyanagar (km 290.000) to Hasapur (km 512.000) in the State of Maharashtra on BOT (Toll) Mode 2nd call
IE for (PKG1) Dev of 6L access controlled greenfield highway starting from Junction with NH-60 at Adgaon (km. 138.00) to Ahilyanagar (km. 290.000) to start of Ahilyanagar bypass (km. 126.564) of NH-160 in Maharashtra on BOT (Toll) Mode 2nd call
Consultancy Services for preparation of Detailed Project Report (DPR) for construction of Bathinda Bypass and for Upgradation of Ferozepur Fazilka State Road to 4 lane National Highway in the state of Punjab
Consultancy Services for preparation of Detailed Project Report (DPR) for Four laning of Trichy Karur Coimbatore (Greenfield) and Northern Trichy Bypass (Total Tentative Length 230 Km) in Tamil Nadu (2nd Call)
Major Public Organizations
Browse Other States
Strategic Bidding Insights for
Head Office - NHAI Tenders
Head Office - NHAI currently has 191 active tender opportunities. Tenders are available across 4 states including Delhi, Uttar Pradesh, Odisha, Haryana. Browse the latest procurement notices, bid invitations, and contract opportunities from Head Office - NHAI to find opportunities matching your business.
Navigating procurement in this sector requires thorough documentation and adherence to stringent eligibility criteria. Most successful bidders in this category maintain updated vendor profiles and demonstrate strong logistical capabilities.
Actionable Tips
- 1Review the specific empanelment criteria for Head Office - NHAI.
- 2Track corrigendum updates diligently to avoid bid rejection.
- 3Maintain high-resolution digital copies of technical qualifications.