Live Opportunities
20
Data Freshness
Daily Sync
Top Segment
Works
Budget Range
1.5 Lakh - 16.8 Lakh
Live Opportunities
Raising of Plantation 2026 rains Riparian eco system rejuvenation through catchment area 20 Ha at Kendige Fsy No. 18 Ankola Range
Raising of Plantation 2026 rains Augmentation of and afforestation of Ochlandra reeds 5.11 Ha at Brahamur Fsy No. 129 & 8 Hoskambi Range
Raising of Plantation 2026 rains Augmentation of and afforestation of Ochlandra reeds 5 Ha at Gule Fsy No. 28 Ankola Range
Raising of Plantation 2026rains Augmentation of ANR Model Rengeneration & degraded forest land 10 Ha at Kuntkani Fsy No. 65 Hoskambi Range
Raising of Plantation 2026rains Augmentation of ANR Model Rengeneration & degraded forest land 14.87 Ha at Shevkar XXV-41 F.Sy No-41A Ramanguli Range
Raising of Plantation 2026rains Augmentation of ANR Model Rengeneration & degraded forest land 20 Ha at Kawalalli Fsy No. 3, Bl-XXIV-28 Mastikatta Range
Raising of Plantation 2026 rains Indigeneous Fruit yielding species regeneration 25 Ha at Brahmur Fsy No. 103&95 & 99 Hoskambi Range
Raising of Plantation 2026 rains Indigeneous Fruit yielding species regeneration 25Ha at Halavalli(Kankanhalli) XXV-51, F,Sy No-41 Ramanguli Range
Raising of Plantation 2026 rains Indigeneous Fruit yielding species regeneration 22.31 Ha at Dongri Fsy No. 46&47 Mastikatta Range
Raising of Plantation 2026 rains Riparian eco system rejuvenation through catchment area 11.12 Ha at Shevkar XXV-41 F.Sy No-41A Ramanguli Range
Maintenance of One year old Aero dynamic coastal shelter belt monson plantation Zone-I&II 5 Ha at Harwada Fsy No. 255, 61, 247, 258 & 258 P-I & II & Belekeri Beach area Ankola Range
Raising of Plantation 2026 rains afforestation of barren Lateritic areas near coastal areas to augment coastal resiliance against Plastic pollution (Latertic Pltn) at 8 Ha Manigadde Fsy No. 18 Hoskambi Range
Raising of Plantation 2026 rains afforestation of barren Lateritic areas near coastal areas to augment coastal resiliance against Plastic pollution (Latertic Pltn) at 24.57 Ha Sakkalbena F.Sy No 97,Manjguni F.Sy No 93 P-I to III, Surve F.Sy No. 27 and Hadav F.sy No 88, Shirkuli F.Sy No. 253 &260, Alageri F.Sy No 188 , Shetageri F.Sy No.297 Ankola Range
Raising of Plantation 2026 rains Augmentation of swamp Regeneration and management to conserve the endangered swamps at 9.73 Ha Kammani Fsy No. 1 Ramanguli Range
Maintenance of One year old Mangrove Plantation at 17.50 Ha Juga P-I&II, Sagadgeri, Vasurkudrigi & Angle Mogta Coastal Marine Ankola Taluk
Maintenance of One year old Riparian Zone Rejuvenation and afforestation as vegetative traps/wall and vegetative Plastic traps at 40 Ha Hillur Fsy No. 417 & Brahamuru Fsy No. 84 Hoskambi Range
Maintenance of One year old Riparian Zone Rejuvenation and afforestation as vegetative traps/wall and vegetative Plastic traps at 40 Ha Halwalli Fsy No. 39 & Vaidyheggar Fsy No. 41 Ramanguli Range
Maintenance of One year old Riparian Zone Rejuvenation and afforestation as vegetative traps/wall and vegetative Plastic traps at 45 Ha Dongri Fsy No. 48, Bl-XXV-58 & Dongri Fsy No. 81, Bl-XXV-56 Masthikatta Range
Maintenance of One year old Riparian Zone Rejuvenation and afforestation as vegetative traps/wall and vegetative Plastic traps at 45 Ha Gule Fsy No. 28& Gule Fsy No. 28& Harwada Fsy No. 68A Ankola Range
Maintenance of One year old Aero dynamic coastal shelter belt monson plantation Zone-IV 60 Ha at Algeri Fsy No. 193A1A1P-I&II & Belse Fsy No. 319A1A1A1A1A Ankola Range
Strategic Bidding Insights for
Works Kfd Acf Territorial Sub Division Office Ankola, Karnataka Tenders
Browse 20 active works tender opportunities in Kfd Acf Territorial Sub Division Office Ankola, Karnataka. Find the latest procurement notices and bid invitations related to works from various government departments and organizations in Kfd Acf Territorial Sub Division Office Ankola.
Navigating procurement in this sector requires thorough documentation and adherence to stringent eligibility criteria. Most successful bidders in this category maintain updated vendor profiles and demonstrate strong logistical capabilities.
Actionable Tips
- 1Analyze technical specifications early to ensure alignment.
- 2Check for Joint Venture (JV) possibilities in large projects.
- 3Prepare high-quality case studies of similar work completed.